Shristi Infrastructure Development Corporation Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Aug 09, 2025

LATEST STATUS
Long Term ASM - BSE, Stage I
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage I 23 Jul 2025 Active
BSE Long Term ASM Stage I 16 Sep 2024 20 Sep 2024
BSE Long Term ASM Stage I 13 Dec 2023 14 Dec 2023
BSE Long Term ASM Stage I 12 Jan 2022 13 Apr 2022
BSE Long Term ASM Stage I 24 Dec 2020 01 Jan 2021
BSE Short Term ASM Stage I 25 Jun 2020 03 Jul 2020